Project - Fonterra foods buffer manifold project.
The main valve manifold in the foods department redline was replaced with a new manifold. The project consisted of the disconnection and removal of the old manifold. Followed by installation, wiring and commissioning of the new manifold. This was installed and commissioned over a 4-day period. The new manifold allows for more user-friendly serviceability and maintenance. Installation as per Fonterra Engineering Standards (FES)
Included in the project were the following services:
Pre-wire & connect 33 x Single port Alfa Laval think top valves.
Pre-wire & connect 37 x Three port Alfa Laval think top valves.
Relocate & reconnect 5 x manifold pumps.
Relocate & reconnect 4 x flowmeters.
Install new AB flex PLC rack into existing IO panel.
Commission all of the above alongside Fonterra’s automation team.